Updated Schedule:
2025 Street Maintenance Projects
This Saturday, August 23, 2025, asphalt patching will be completed on Frontier Street from Summerset Avenue to Sable Avenue. During this time, this section of Frontier Street will remain open with one lane, with traffic control on site directing vehicles. Work is scheduled from 8:00 a.m. to 6:00 p.m.
Any further changes to the schedule below will be shared with the community.
July 16, 2025: Work will begin on Monday, July 21, 2025, as a Town of Firestone contractor starts the 2025 Street Maintenance Project. These road improvement projects include asphalt patching, resurfacing, and a mill and overlay.
Weather permitting, regular work hours will be from 7:00 a.m. to 7:00 p.m. Monday through Friday, and the project should be completed by Fall 2025. These schedules are subject to change, and any major changes will be shared with the community.
Residents who are affected by the work in their neighborhoods will receive door hanger notices from the contractor with expectations and specific times for the work on their street.
Resurfacing – Chip Seal
The resurfacing portion of the project will consist of a chip seal on arterial and collector streets. Preparation will include asphalt patching and crack sealing before applying the surface treatment. This will be followed by a fog seal, street striping, pavement marking, and restoration as needed.
The list of roads to be resurfaced includes:
- Most of Sable Ave (CR 22): from E. I-25 Frontage Rd ¼ mile east, from Birch Ave (CR 11) to Colorado Blvd (CR 13), and from Colorado Blvd (CR 13) to Frontier Ave (CR 15)
- Birch St (CR 11), from the southern Town limits to Firestone Blvd (CR 24)
- Frontier Ave (CR 15), from Sable Ave (CR 22) to Firestone Blvd (CR 24)
- Colorado Blvd (CR 13), from Mountain Shadows Blvd to ½ mile north of CR 26
- Pine Cone Ave (CR 20), from Colorado Blvd (CR 13) east to the end of Town of Firestone maintenance
Mill and Overlay – Asphalt Paving/Patching
The mill and overlay portion of the project will involve patching, milling, and overlaying, including traffic control, street striping, pavement markings, and restoration as needed on arterial and collector streets.
List of the roads to be repaired and location description:
- Oak Meadows Blvd between Colorado Blvd (CR 13) and Deerfield Dr: mill and overlay of 1,695 square yards
- CR 26 from Colorado Blvd (CR 13) east 625ft: mill and overlay 800 square yards
- Firestone Blvd (CR 24) at E. I-25 Frontage Rd (CR 9.5): Asphalt patching to restore the transition between the existing asphalt and concrete roadway, 415 square yards
More Information
Motorists should stay alert while driving through the work zone and expect delays. Be aware that multiple lane shifts will happen during construction within active work areas. Vehicles may be reduced to a single lane, with alternating traffic in either direction during active periods of the project. Lane closures might cause delays of up to 10 minutes. Speed limits will be lower in the work zones. Follow all posted traffic signs, slow down, and avoid the work zone if possible.
For more information on this project, please contact the
Town of Firestone Operations and Maintenance Division:
George Hubert at 720-508-4128 or John Pursel at 303-503-9558.